The GEBZE BALÇIK VILLAGE CREEK RECLAMATION WORK, which was put out to tender by the ISU GENERAL DIRECTORATE of the KOCAELI METROPOLITAN MUNICIPALITY, remained in the possession of our company and the ground delivery was made and the work started in March – 2010. The project, which was under construction rapidly, was completed in October – 2010. The project consists of 1400 mt reinforced concrete on the base, 7 – 11 mt U–section stone wall channel on the sides, 2000 mt 800 mm diameter steel reinforced corrugated pipe channel line, 3 reinforced concrete pedestrian bridges, 2 reinforced concrete vehicle bridges and 2800 mt stone wall over the iron railing manufacturing.